Warwick Boys School is the oldest boys school in the country and our mechanical and electrical refurbishment works over the summer holiday consisted of a full strip-out of all existing plant equipment and controls within the boiler house.
Palings completed the boiler room refurbishment works at Warwick Boys School for their existing Sports Pavilion. Our works included supplying and installing new boilers, pump sets, hot water cylinders, CHP unit and full system controls interface.
These works were carried out during the 6 weeks holiday so not to disrupt the running of the school facilities and worked alongside the continuous running of the school swimming pool to ensure summer schools were able to run as per their usual requirements. Even though this was an extremely tight programme we successfully handed over the project back to the school prior to the start of the new summer term.