Palings have recently completed a major live heating upgrade on a local school. The project was a massive challenge due to the existing school heating system being rotten and 70% of it not operational. These works had to be carried out alongside the school still operating as usual, so disruptions had to be kept to a minimum. Working closely with the client we managed to achieve full heat on to the main school in all areas via newly installed fan convectors 8 weeks ahead of schedule.
The project consisted of the installation of new CT heating circuits serving the main school areas, this also involved the following: