Cheltenham Ladies college is a highly prestigious private girls school. Palings carried out a large boiler replacement which incorporated a substantial shell and tube heat exchanger installation.
The project was carried out with extremely awkward access off the main highway through a high-level louvre into the plantroom. The heating installation was installed to renew the college’s systems to enable their heating system to run a lot more efficiently and with peace of mind that in the colder months the heating wouldn’t fail on them.
This project was carried out over the summer shut down over a tight programme and was successfully handed back to the client in time for their summer term.
Or fill in our form below